Skip to main content

PQT/VCP March Update

News
26 March, 2025 - 15:13 (CET)
Announcement
VCP

Recently prequalified products 

Since the last update (December 2024), PQT/VCP has prequalified four new ITNs.

Further details can be found on the prequalification page for each product. 

Product type

Product name

Date of prequalification

Newly prequalified product - ITN

PRONet Duo

12 March 2025

Newly prequalified product - ITN

UNET G1 LN

19 March 2025

Newly prequalified product - ITN

UNET G3 LN

19 March 2025

Newly prequalified product - ITN

UNET G5 LN

19 March 2025


New pipeline products 

New products in the PQT/VCP pipeline are: Mosquito Shield (SC Johnson), a spatial repellent containing transfluthrin; MD3 (GDM Health Products Ltd), an ITN treated with alpha-cypermethrin and chlorfenapyr; and Yorkool G1 Recycled LN (Tianjin Yorkool International Trading Co. Ltd.), an ITN treated with deltamethrin.

Product type

Product name

Date of acceptance for assessment

Spatial repellent

Mosquito Shield

20 December 2024

ITN

MD3

29 January 2025

ITN

Yorkool G1 Recycled LN

29 January 2025

All products that have been accepted for PQT/VCP assessment can be found on the pipeline page.

PQT/VCP target timelines for assessment and listing decision(s) are 365 WHO days from the date of acceptance for assessment. WHO days are defined as those days in which the product dossier is with WHO for assessment, i.e., does not include manufacturer time to respond to Requests for Information. 


Recently published documents 

The chlorfenapyr specification has been updated with the extension of the existing WHO chlorfenapyr TC specification to encompass the technical material produced by Shivalik Rasayan Limited. 

The cypermethrin specification and evaluation report of the cypermethrin technical material produced by Hemani Industries Limited. 

A template for submitting an ITN product manufacturing release specifications has been published. 

 


Updated documents 

The Mosquito coil (MC) specification template for proposers has been updated to reflect the most recent reference analytical methods (as per the templates' publication date).  As such, users of the Chemical and Microbial manuals are encouraged to refer to the templates as a reference point to identify if updated analytical methods are available. 

Implementation guidance related to physical durability tests snag strength and hole formation, as well as the ITN manufacturing release specifications and declaration of construction and sampling have been updated for clarity. 

 

 


Meetings and events 

PQT/VCP hosted a meeting focused on quality assessments in Geneva, Switzerland from 10-14 February. This meeting enabled timely advancement of assessments for those applications submitted by ITN manufacturers in response to the implementation plan of the WHO Guideline for prequalification assessments of ITNs

The latest full ASVCP meeting was held 17-21 March 2024 in Manila, Philippines. 

Both meetings resulted in the advancement of all pending applications in addition to the training of new assessors joining the group after the 2024 open call for applications. 

Meeting/Event

Location

Date

JMPS 2025

Galway, Ireland

11-14 June, 2025

Joint WHO/FAO/CIPAC Meeting 2025

Galway, Ireland

16 June 2025

Technical Consultation on Gender Mainstreaming in Vector Control Product Regulation

Geneva, Switzerland

 

30 September - 2 October 2025

ASVCP (2025.2)

Virtual

 

17-21 November