Submitted by Vania on Tue, 07/19/2022 - 15:19
Config Form ID
Country
End Year
2022
IHR Technical Category
Activity Objective
Designate National Points Of Entry and build infrastructure at these PoEs by 2026
Currency
Prioritized
Non-Prioritized
Start Year
2018
Technical Area
Is Technical Assistance required to complete this activity?
No
Percentage of Implementation
100.00%
Status
Activity Details
Share report of assesment with NAIA -specific and national stakeholders at 'Report Dissemination and Strategy Development Meetings'. (Each IHR assessment requires site visits to and a final assessmnet meeting with between 15 and 20 agencies)

1. The Post-IHR assessment meeting will consist of 15 and 20 agencies (50 participants).
2. This will require 1 coffee and 1 lunch break.
3. The assessment meeting will require travel for 4 directorate cadre staff.
4. The assessment meeting will require renting a venue.
Summary Activity
Conduct IHR assessment for core capacity requirements at designated airports and ports (40-50 persons/site) - Site visits
Cost
1240000.00
0.00
0.00
0.00
0.00
0.00
Original Cost in USD
2909.00
Todays Cost in USD
2909.00
Total Cost
1240000.00
Country Specific Indicator
PoE.1: Routine capacities are established at PoE
NAPHS Type
NAPHS