Config Form ID
Country
End Year
2022
IHR Technical Category
Activity Objective
Designate National Points Of Entry and build infrastructure at these PoEs by 2025
Currency
Prioritized
Non-Prioritized
Start Year
2018
Technical Area
Is Technical Assistance required to complete this activity?
No
Percentage of Implementation
100.00%
Status
Activity Details
Develop an action plan to address the gaps at each of the selcted points of entry.

1. The consultants will meet in Abuja for 5 days to evaluate the results of the assessment tools, determine the scores of each PoE, identify the gaps and develop action plans to address each of the selected points.
2.They will require renting an office space for the 5 days
3. 1 coffee and lunch break would be required for 5 days
Summary Activity
Conduct IHR assessment for core capacity requirements at designated airports and ports (40-50 persons/site) - Site visits
Cost
1750000.00
0.00
0.00
0.00
0.00
0.00
Original Cost in USD
4105.00
Todays Cost in USD
4105.00
Total Cost
1750000.00
Country Specific Indicator
PoE.1: Routine capacities are established at PoE
NAPHS Type
NAPHS