Designate National Points Of Entry and build infrastructure at these PoEs by 2022
Currency
Prioritized
Non-Prioritized
Start Year
2018
Technical Area
Is Technical Assistance required to complete this activity?
No
Percentage of Implementation
100.00%
Status
Activity Details
Identify and assemble stakeholders to participate in assessment - all agencies at POE;
a. Conduct IHR assessment for NAIA
1. A final assessment meeting with between 15 and 20 agencies (50 participants) will hold at the PoE. This will require 1 coffee and 1 lunch break. 2. The final assessment meeting will require travel for 4 directorate cadre staff (this is in addition to the 5 IHR consultants). They would require flight tickets to and from Abuja, accommodation and per diems for 3-days (including 2 travel days)
a. Conduct IHR assessment for NAIA
1. A final assessment meeting with between 15 and 20 agencies (50 participants) will hold at the PoE. This will require 1 coffee and 1 lunch break. 2. The final assessment meeting will require travel for 4 directorate cadre staff (this is in addition to the 5 IHR consultants). They would require flight tickets to and from Abuja, accommodation and per diems for 3-days (including 2 travel days)
Summary Activity
Conduct IHR assessment for core capacity requirements at designated airports and ports (40-50 persons/site) - Site visits
Cost
1240000.00
0.00
0.00
0.00
0.00
0.00
Original Cost in USD
2909.00
Todays Cost in USD
2909.00
Total Cost
1240000.00
Country Specific Indicator
PoE.1: Routine capacities are established at PoE
NAPHS Type