ID PQS quality assurance protocol E003/PV01-VP2.2: Solar power system for compression-cycle vaccine refrigerator or combined refrigerator and water-pack freezer — on-site checklists for completed installations PDF
ID PQS quality assurance protocol PVDC-VP2.0: Solar power system for low electrical requirements ‒ on-site checklists for completed installations PDF
ID PQS test protocol E003/RF03-VP.3: Ice-lined refrigerator or combined ice-lined refrigerator and water-pack freezer: compression cycle PDF
ID PQS test protocol E003/RF05-RF06: Refrigerator or combined refrigerator and water-pack freezer: compression-cycle. Solar direct drive with or without ancillary battery PDF
ID PQS test protocol: Ice-lined refrigerator or combined ice-lined refrigerator and water-pack freezer: compression cycle PDF
ID PQS type-examination protocol E003/PV01-VP1.2: Solar power system for compression-cycle vaccine refrigerator or combined refrigerator and water-pack freezer PDF
ID PQS type-examination protocol E008/JI01-VP.1: Single-use auto-disable needle-free syringe injectors PDF
ID PQS type-testing protocol E003/FZ01-VP.2: Vaccine freezer or combined vaccine and water-pack freezer: compression-cycle PDF
ID PQS type-testing protocol E003/FZ02-VP.2: Vaccine freezer or combined vaccine and water-pack freezer: compression-cycle PDF
ID Prequalification of cold chain-related products under the PQS system: a guideline for manufacturers of insulated containers & coolant packs type water-packs E004-005/GUIDE.1.3 PDF
ID Prequalification of cold chain-related products under the PQS system: a guideline for manufacturers of solar power systems E003/GUIDE.2.3 PDF
ID Prequalification of cold chain-related products under the PQS system: a guideline for manufacturers of vaccine refrigerators, vaccine freezers and water-pack freezers E003/GUIDE.1.3 PDF
ID Prequalification of cold chain-related products under the PQS system: a guideline for manufacturers of waste management equipment E10/GUIDE 1.3 PDF
ID Prequalification of cold chain-related products under the PQS system: guidelines for manufacturers of temperature monitoring devices E006/GUIDE1.3 PDF
ID Prequalification of single-use injection devices under the PQS system: Guidelines for manufacturers E008-E013/GUIDE1.4 PDF